House construction in Poreč. Structural shell and turnkey delivery.
House and villa construction in Poreč, Croatia: foundations, reinforced concrete, masonry and roofing. Clear scope, local references and a contact for owners abroad.
Access, site conditions, logistics, the existing structure and the required finish can affect the work just as much as floor area.
Before pricing, we connect the documents with the actual site. We verify access, measurements, substrates, interfaces and open decisions, then define who is responsible for each phase.
SERVICES NEAR YOU · Poreč
From the structure to the final visible detail.
01Turnkey house construction — One organisation from project review and structural work to services, finishes and handover.
02Structural construction — Earthworks, foundations, reinforced concrete, masonry and roofing as one connected phase.
03Complete renovations — Demolition, repair, building services and finishes in the correct technical sequence.
04Stone-house renovation — Structure, moisture, roof, stone details and a modern interior treated as one system.
05Façades and façade systems — Substrate preparation, thermal insulation, reinforcement, plinth and finish coat.
06Drywall and Knauf systems — Partitions, linings, suspended ceilings, insulation and joint finishing.
For a new house in Poreč and the Tar–Vabriga area, we check access to the plot, space for the concrete pump and crane, and material storage. Architectural and structural drawings allow quantities, supplies and responsibilities to be defined before pricing.
01
Structural shell from foundations to roof
Under the agreed drawings and bill of quantities: earthworks, foundations, formwork, reinforcement, concrete, load-bearing and partition walls, plus the roof structure and specified roof layers. The term ‘structural shell’ or ‘roh-bau’ alone does not define every included item.
The structural stage is followed by the contracted building services, windows and doors, façade, substrates, floor and wall finishes. Pools, landscaping, utility connections, design work and furnishings are expressly included or excluded in the quotation.
Concrete in m³, reinforcement in kg, formwork in m² and masonry under the specified item: checked quantities and site conditions form the pricing basis. The contract defines the measurement or other agreed pricing method, payment stages and any confirmation of completed work.
We separate included and excluded work, material procurement, VAT and the process for variations. Start dates and capacity are confirmed after reviewing the project. An initial estimate is not a firm quotation.
How much does it cost to build a house in Poreč?
Ground conditions, foundations, design quantities, structural details, roofing and the specification of finishes determine the price. Compare offers using the same gross or net floor area, scope and VAT basis. A firm quotation requires a review of the documents and site conditions.
What to send for an initial review
The plot location and photographs of the access.
Floor plans, sections and structural drawings, if available.
A bill of quantities, floor area and your preferred scope: structural shell or turnkey.
Your intended start date and the status of the drawings and permits.
A short project description is enough for the first conversation. Your point of contact is Milan Maronić. We then agree any further documents, a site visit and how progress will be communicated while you are away.
Screeds, service chases, drywall, tiling and finishes within the published scope. The video shows work in progress; this reference does not document construction of an entire new house.
We undertake turnkey and structural construction, complete renovations, façades, drywall, surface preparation, painting and related finishing works. The final scope depends on the documents, condition, timing and size of the project.
02Do you work in nearby towns?+
Yes. Subject to project scale and availability, we organise work in the surrounding area. Tar, Vabriga, Červar-Porat, Funtana, Vrsar, Novigrad.
03Can you quote from photographs or a property listing?+
They are enough for an initial discussion, but not for a reliable final price. A site inspection, measurements and suitable project documents or a bill of quantities are required.
04Can you manage the project if the owner lives abroad?+
Yes, when the reporting rhythm, approval authority, material decisions and deadlines are agreed before work starts.
05How do you control additional work?+
A hidden defect or requested change is documented. Where possible, the technical solution, cost and programme impact are approved before execution.