Tecton Grupa
TECTON / CONSTRUCTION ESTIMATE

Project documents + bill of quantities · Istria

How much will
your house
cost to build?

Choose the required scope, upload Volume 1 of the approved design package or detailed construction drawings together with the corresponding bill of quantities. Once the documents have been checked, the system produces one total Tecton estimate.

How it works

Your documents go in.
Our internal price book stays private.

AI identifies documents, items and quantities. Prices are applied separately in Tecton’s private pricing system, and the client sees only the total estimated range.

I have drawings — construction estimateNo drawings yet — let's talk
01

Project identification

First, we need to know whose project we are estimating.

Automatic results are not available for anonymous bills of quantities. The client’s name or company name must also appear in the uploaded project documents.

Estimate safeguards

This is not a public
price list.

01

Project documents are required

A bill of quantities alone does not unlock an automatic result.

02

The client is verified

The client’s name or company name must appear in the approved or detailed design documents.

03

Only the final range is shown

No category totals, quantity calculations or unit rates are shown.

04

The price book stays private

The internal price database is not exposed in the public interface or document-analysis layer.