Completed full renovation of a house in Istria

COMPLETE HOUSE RENOVATION · ISTRIA

A renovation is not one trade.
It is one controlled sequence.

Complete renovation of houses, villas and apartments in Istria — demolition, repair, installations, finishes and coordination under one accountable construction organisation.

WHAT SERIOUS INVESTORS NEED

A defined scope before work. Control while it is being built.

The largest renovation risks are hidden behind existing finishes. The job is to expose them early, decide correctly and protect the budget from uncontrolled changes.

A good result starts before mobilisation. We clarify responsibilities, interfaces and open decisions, then manage execution through construction phases instead of improvising from week to week.

BEFORE THE PROPOSAL

A clear delivery model before work starts.

The proposal, project documents and contract define inclusions, exclusions, responsibilities and the commercial basis.

01

Who this is for

Owners of houses, villas or apartments who need one organisation to connect construction and finishing phases.

02

Tecton delivers

Construction interventions, drywall, surface preparation, painting, tiling, floors and agreed finishing works.

03

We coordinate

Electrical, plumbing, machine plastering, screeds and other specialist phases through subcontractors when contracted.

04

What we need from you

For the first conversation: location, photos and intended result. A final proposal requires a site review and defined scope.

SCOPE OF DELIVERY

What Tecton can coordinate as one project.

  1. 01Survey of the existing condition and selective opening
  2. 02Controlled demolition and disposal
  3. 03Structural repair and local reinforcement
  4. 04New electrical and plumbing installations
  5. 05Waterproofing, insulation and screeds
  6. 06Drywall, plastering and surface preparation
  7. 07Tiling, floors, painting and final installation
  8. 08Façade, terraces and agreed external works

RISK CONTROL

Where renovation budgets are lost

01

The existing condition is priced without inspection

02

Demolition starts before decisions are frozen

03

Installations and finishes are planned independently

04

Additional work is not documented when discovered

EXECUTION PROCESS

Five controlled stages from review to handover.

  1. 01

    Project review

    We review the property, drawings, bill of quantities, desired standard and open risks.

  2. 02

    Site inspection

    The actual condition, access, measurements and technical constraints are verified on site.

  3. 03

    Scope and proposal

    The work packages, exclusions, decisions, timing and commercial framework are defined.

  4. 04

    Execution and reporting

    Trades, procurement and sequencing are coordinated through agreed construction phases.

  5. 05

    Review and handover

    The result is inspected, open items are recorded and the project is formally handed over.

DELIVERY EVIDENCE

Real renovations. Precisely stated delivered scope.

Complete apartment renovation — Poreč
Poreč · TECTON SCOPE

Complete apartment renovation

Screeds, service chases, two bathrooms, drywall, masonry, vinyl, skim coating, painting and façade work.

View case study

DECISION GUIDES

Clarify the decisions that affect delivery before requesting a proposal.

INTERNATIONAL INVESTORS

Living outside Croatia?

Use our dedicated investor page to send a property link, plans and photographs. We will identify the next useful step before you travel to Istria.

Project from abroad

FREQUENTLY ASKED QUESTIONS

Answers before the first site visit.

01Can you quote a renovation from property-listing photos?

Photos are useful for an initial qualification, but not for a reliable final quotation. A site inspection and, depending on the property, selective openings or additional documentation may be required.

02Can we remain partly in the house during renovation?

It depends on the scope, dust protection, utilities and safety. For a complete renovation, vacant possession is usually more efficient and produces a cleaner sequence.

03How are hidden defects handled?

They are photographed and documented when discovered. The technical consequence, cost and programme impact should be approved before additional execution whenever possible.

04Do you coordinate specialist trades?

Yes, within the agreed project scope. Clear responsibility for each trade and interface is established before that phase begins.

CONFIDENTIAL PROJECT ENQUIRY

Send what you already have.

A location, property link, photographs or plans are enough for the first review. We will tell you what the next useful step is.