Completed interior with level walls and ceilings in Istria

DRYWALL & KNAUF SYSTEMS · ISTRIA

A flat surface is not enough.
The system behind it matters.

Drywall partitions, linings, suspended ceilings, slopes and reveals in Istria — from measurement and framing to insulation, boarding, joint treatment and preparation for the final finish.

BEHIND THE BOARD

Drywall quality is decided before the last board is fixed.

Stud type and spacing, suspension, reinforcement, services and board specification matter more than how quickly the surface appears finished.

Before closing the system, we verify its purpose, service routes, required reinforcement, insulation and room conditions. The finished plane then completes a defined build-up instead of concealing improvisation.

SCOPE OF WORK

Dry construction from setting-out to a surface ready for finishing.

  1. 01Survey, setting-out and coordination with drawings and building services
  2. 02Metal framing for partitions, linings, ceilings and slopes
  3. 03Partitions, wall linings, suspended ceilings, attic slopes and reveals
  4. 04Reinforcement for sanitaryware, furniture, lighting and known loads
  5. 05Install mineral insulation and boards suited to the room and required performance
  6. 06Treat joints, corners and transitions to the contracted finish level

DETAILS THAT DECIDE DURABILITY

Four mistakes that become visible only after painting or occupation

01

Framing and hangers do not suit the span, height or design load

02

Services, lighting and reinforcement are decided after boards are closed

03

Board and insulation types are chosen without checking moisture, acoustics or use

04

Joints and transitions are treated without agreeing the finish level and lighting conditions

HOW WE WORK

Five controlled stages from inspection to handover.

  1. 01

    Condition and requirements

    We review drawings, actual conditions, access and the expected finish.

  2. 02

    System and proposal

    We define the included build-up, quantities, protection, finish standard and open items.

  3. 03

    Preparation

    Access and protection are organised and the substrate or supporting construction is prepared.

  4. 04

    Execution and control

    Work is checked at the points that will no longer be visible after the next layer.

  5. 05

    Final review

    Details are inspected, corrections recorded and the work area handed over in the agreed condition.

COMPLETED TECTON WORK

Premium finish starts beneath the visible surface.

Our Krasica work records what the finished interior no longer reveals: tall-wall framing, insulation, services and the closure of wall linings.

Tall drywall framing in the Krasica residential complex
View all projects

FREQUENTLY ASKED QUESTIONS

Answers before a reliable proposal.

01What drywall work do you undertake?

Partitions, wall linings, suspended ceilings, attic slopes, reveals, service enclosures, agreed niches and joint treatment to the level defined in the proposal.

02What is the difference between standard, moisture-resistant and specialist boards?

They have different purposes and performance. Selection depends on room use, moisture, design requirements, required resistance and the complete system—not the board colour alone.

03Can a TV, kitchen cabinet or sanitary fitting be fixed to drywall?

Yes, when position and load are known in advance and suitable reinforcement or fixing support is installed. Heavy items should not be added later without knowing the framing.

04Does drywall pricing include full skim coating and painting?

Not automatically. Joint treatment, full-surface skim coating and finish painting are separate stages. The proposal must define the delivered surface level.

05Do you line attics?

Yes, when roof build-up, insulation, vapour control, penetrations and roof-window details are technically coordinated before closure.

CONFIDENTIAL PROJECT ENQUIRY

Send what you already have.

A location, property link, photographs or plans are enough for the first review. We will tell you what the next useful step is.

01Project
02Contact
03Send enquiry

The first enquiry takes about two minutes.

How should we contact you?

Security check in progress. Sending will be enabled automatically.