New timber roof structure in Vilanija

ROOFING · ISTRIA

A roof rarely leaks in the middle. It leaks at the junction.

New roofs, roof-covering replacement, sheet-metal work and flat roofs in Istria — structure, insulation, covering and drainage as one system.

Scope

A roof rarely leaks in the middle. It leaks at the junction.

Most roof failures begin at junctions, penetrations, flashings, valleys and drainage. Replacing tiles without resolving those details changes the appearance, not the risk.

Scope

A clearly defined scope of work.

  1. 01New timber roof structures and coverings
  2. 02Replacement of existing roof coverings
  3. 03Flashings, valleys, gutters and downpipes
  4. 04Flat roofs and terraces above heated space
  5. 05Roof thermal insulation
  6. 06Chimneys, ventilation, roof windows and other penetrations
  7. 07Roof rehabilitation on stone houses

Risk control

Risk control

01

The covering is replaced without inspecting the structure

02

Sheet-metal details are treated as decoration

03

Insulation is installed without resolving ventilation

04

Penetrations are improvised after covering

How we work

Five controlled steps from review to handover.

  1. 01

    Documents and objective

    We review drawings, the bill of quantities, photographs and the required standard.

  2. 02

    Site inspection

    We verify actual conditions, measurements, access and technical constraints.

  3. 03

    Scope and proposal

    Included work, responsibilities, decisions, phases and the commercial framework are defined.

  4. 04

    Execution and control

    We coordinate sequence, people and procurement and record changes affecting cost or programme.

  5. 05

    Review and handover

    Completed work is inspected, open points are recorded and the agreed scope is handed over.

Frequently asked questions

Answers before the first serious decision.

01Do you execute both the structure and covering?

Yes. Structure, covering, sheet-metal work and insulation can be delivered as one coordinated scope.

02Do you work on flat roofs?

Yes, including terraces above heated rooms, where waterproofing and drainage are decisive.

03Can the covering be replaced without changing the structure?

Sometimes, but only after the existing structure has been inspected.

04Do you work on old stone houses?

Yes. The roof is often the first major element that must be renewed.

CONFIDENTIAL PROJECT ENQUIRY

Send what you already have.

A location, property link, photographs or plans are enough for the first review. We will tell you what the next useful step is.

01Project
02Contact
03Send enquiry

The first enquiry takes about two minutes.

How should we contact you?

Security check in progress. Sending will be enabled automatically.