How much does a swimming pool cost in Istria?

The supplied pool-technology figure is €7,400 for materials for a 6 × 3 m pool; it is not the price of a complete swimming pool. Excavation, the pool structure, waterproofing, finishes, installation and surrounding works need their own defined scope. Indicative prices excluding VAT; the final price is confirmed after a site inspection and preparation of an itemised bill of quantities.

Which indicative work rates are available?

Tecton price list, October 2026. Indicative amounts.
Work itemPrice excluding VAT
Watertight concrete for stairs / pools185.00 € / m³Indicative prices excluding VAT; the final price is established after a site visit and preparation of a bill of quantities.
B500B reinforcement, supply and installation2.00 € / kgIndicative prices excluding VAT; the final price is established after a site visit and preparation of a bill of quantities.
Pool equipment for 6 × 3 m — material only7,400.00 €Indicative prices excluding VAT; the final price is established after a site visit and preparation of a bill of quantities.

Why can pool equipment not represent the complete build?

A pool combines building work, water treatment, circulation and finishing details. A material allowance for selected equipment cannot answer how the structure is designed or how the surrounding ground and drainage are treated. A complete quote should identify every package and the interfaces between them. The exact price and scope are determined from the project, site conditions and bill of quantities. Request a quotation for your particular works. Keep that missing total separate from the equipment figure instead of presenting a partial allowance as a finished pool.

What should be known about the site before excavation?

The planned pool position needs to be considered alongside the house, boundaries, access and the intended finished levels. Machinery access, temporary storage and the route for removing excavated material can change the organisation of work. The depth, geometry and ground conditions must be assessed in the project; an online guide cannot establish the structure for a particular plot. Record existing utilities and clarify how work will proceed around neighbouring structures. These checks help identify the real excavation scope before it is compared with a generic volume-based rate.

What does the concrete figure actually describe?

The supplied schedule gives €185/m³ for the specified stair or waterproof-pool concrete item. This is a concrete rate, not the cost of a complete pool shell and not a guarantee that concrete alone creates a finished watertight pool. Indicative prices excluding VAT; the final price is confirmed after a site inspection and preparation of an itemised bill of quantities.

The designed structure also needs its specified reinforcement, formwork, joints, penetrations and installation method. The designer’s detail should coordinate the shell with drains, fittings and subsequent finishes. Clarify who supplies and places each item, how quantities are measured and what inspection or acceptance takes place before work becomes concealed. Avoid adding unrelated headline items together without a complete drawing-based bill of quantities.

How should waterproofing and the pool finish be specified?

The quote should identify the waterproofing solution, its connection to fittings and the compatible finish. A tiled pool and another finishing system may involve different substrates, details and work sequences. Edges, steps, penetrations and joints require particular attention because a simple wall-area total does not describe those interfaces. Ask for the selected system and the responsibility for preparation to be stated in writing. Visual appearance is only one part of the specification; the treatment of water-retaining details needs a coherent project-specific solution.

What needs to be included with the pool plant?

The equipment schedule should describe the chosen circulation and treatment arrangement and identify the exact materials covered by the quoted allowance. Plant location, access for maintenance, pipe routes and the relevant connections need to be coordinated before the structure is finished. Ask whether installation, commissioning and the operating instructions are included or separate. Do not assume that heating, covers, automation, additional lighting or other accessories are part of a general pool-technology heading. Each selected option should appear explicitly so that different offers describe the same installation.

Which surrounding works are often a separate package?

The terrace, coping, drainage, external lighting, planting and access paths should be considered alongside the pool but separately described in the offer. Finished levels must work together: a pool edge, adjoining paving and drainage route cannot be priced sensibly as unrelated visual elements. Where existing external surfaces are retained, clarify how the junction will be formed. The budget should distinguish the pool itself from surrounding landscaping and equipment choices. This is especially useful when the house and external works are contracted in different stages.

How can investors compare pool offers fairly?

Use the same dimensions, drawings, finish and equipment schedule in every enquiry. Compare the excavation assumptions, disposal arrangements, structural scope, waterproofing details and plant installation responsibilities. Check net and VAT bases consistently, and ask what remains to be selected or measured. If an alternative is proposed, record how it changes operation, maintenance and the interfaces with building work. The most useful comparison is a complete list of what will be delivered, rather than a total that leaves the pool edge or equipment installation unresolved.

What should be sent for a pool assessment?

Send the location, proposed position on the plot, available drawings and photographs of the access and surrounding ground. Describe the intended pool size and finish, and whether the pool forms part of a house build or a separate project. Identify any selected equipment and existing external surfaces that must remain. Tecton offers pool construction in Istria; the enquiry should lead to a defined building and installation scope rather than an assumed complete price from an equipment-material allowance.

Which services, locations and projects should you explore?

What else should you clarify before starting?

Is the equipment-material figure a turnkey pool price?

No. It refers only to the stated pool-technology materials for the specified pool size. It does not establish the cost of excavation, shell construction, waterproofing, finishes, equipment installation or the surrounding terrace.

Does waterproof concrete remove every waterproofing detail?

The pool needs a coordinated design for the structure, joints, penetrations and selected finishing system. A concrete description by itself does not confirm the complete solution or replace the specified construction details.

Can the pool be built with the house?

The scopes can be discussed together, but the offer should identify the pool as a distinct package with its own interfaces, measurements and completion requirements. This helps coordinate levels, access and external works.

Is the pool terrace included automatically?

No. Coping, paving, drainage and other surrounding work should be listed expressly. Check the finished levels and junctions as well as the surface area, especially if the terrace is being supplied under another package.

Can equipment options be selected later?

Some decisions affect concealed pipework, electrical connections and plant space. Identify those decisions before the relevant construction stage. Later changes should be reviewed for their effect on completed work rather than assumed to be interchangeable.

What is the next step for a specific plot?

Send the proposed location, available project documents and photographs of access. State the intended dimensions and finish, so that the discussion can identify missing design information and the building and installation packages that need pricing.

How can you request a free initial assessment?

Send the location, scope and approximate area. A detailed bill of quantities and final quotation depend on documents and a site review; the scope of that work is agreed separately.

QUICK ENQUIRY · NO DESIGN OR BILL OF QUANTITIES REQUIRED

Tell us where the project is and what you need.

For the first conversation, the location, type of work, telephone number and a short description are enough. Add photographs and documents if you have them.

01Location and work
02Contact
03Send enquiry

The initial enquiry takes about one minute.

Add more detailsOptional
How should we contact you?

The security check is in progress. Submission will be enabled automatically when it finishes.